Modular and prefabricated buildings

One design. Every site.

Modular and prefab construction is now mainstream, for homes and commercial buildings alike, and the ABCB has published a handbook on how it meets the NCC. One design may be built in a factory in one state and placed in many climate zones, orientations and states. We set up its energy compliance so it works wherever it lands.

A building is designed for one site. A module, for many.

A site-built building is assessed once, for its own site. A modular design, whether a home, a classroom or a workforce camp, is repeated across many sites, each with its own climate zone, orientation and state rules, and much of it is built before the site is known. Compliance has to be planned for the whole range, not just the first order.

ABCB handbook · Prefabricated, modular and offsite construction
  1. Every orientation

    We test the design in each orientation it may face, and find the specification that passes in all of them.

    Orientation
  2. Every climate zone

    The same module behaves very differently in the tropics and in Tasmania. We map which climate zones each specification covers.

    Climate
  3. Every state

    A module built in one state and installed in another must meet the rules where it is installed, including that state’s variations.

    Variations
  4. Joins and frames

    Module joins and frames are where heat finds a way through. Our two-dimensional modelling shows how much, and how to detail it.

    Thermal bridging
  5. Embodied carbon

    A life cycle assessment of the module design to EN 15978, done once for the whole range, shows its embodied carbon and where the materials can cut it.

    LCA

Homes and commercial. Every route.

Modular homes, and modular commercial buildings, through whichever compliance route suits the design, from our own accredited assessors and building physicists.

Homes

NatHERS and Whole of Home

Ratings for every design, and for each site as orders come in, most within one business day of complete plans.

Commercial

Section J, every method

From Deemed-to-Satisfy reports to J1V3 modelling, for modular classrooms, clinics, offices and accommodation.

When it bites

Performance Solutions

When a standard route penalises how modules are built, H6V2 or J1V3 tests the design as a whole.

Set up once. Compliant on each site.

The work is front-loaded. Once the range is set up, each new order needs only its own site assessment.

  1. 01

    The range

    Your designs, the building types and regions you sell into, and how the modules are built and joined.

  2. 02

    Every orientation

    Each design tested in each orientation and climate zone it may meet.

  3. 03

    One specification

    The specification that passes everywhere you sell, or a short set of options by region.

  4. 04

    Each site

    Compliance for each site as orders come in, with most home ratings back within one business day of complete plans.

From the factory floor to the final site.

Modular builders and manufacturers

Designs set up to comply across your whole market, and fast compliance for each order.

Developers

The energy pathway settled before the modules are built.

Architects and building designers

Orientation and climate tested at concept stage, while the design is still yours to change.

Building surveyors and certifiers

Submissions that show how each site complies, with every assumption in writing.

Send us the design you want to build anywhere.

Your designs, and the regions you sell into. We reply within 24 hours.